Availability: | |
---|---|
Quantity: | |
The product flows from the previous process to this production line;
High temperature furnace solidification;
Cooling furnace quickly reduces product temperature;
Automatic cleaning and dust removal;
Vacuum glue filling (solves the problem of bubbles in the glue, allowing the glue to be filled uniformly, with a flat surface and complete internal filling);
High temperature furnace curing (accelerating adhesive curing);
Cooling furnace (quickly reducing product temperature);
Product flow to the next stage of the process;