Brake-by-Wire One-box System Assembly & Testing Line
HOLS
| Availability: | |
|---|---|
| Quantity: | |
ONE-BOX Assembly Line Technical Specifications
Cycle Time (C/T): ≤40s
Annual Capacity: ≥490,000 units
Yield: ≥98%
Operators: ≤12 operators
Product Variants: 6 models
ONE-BOX Assembly Line Key Processes
1.Valve Body Loading & Marking
2.HCU Valve Body Visual Inspection & Guide Sleeve Assembly
3.Valve Body Ball Press-Fitting
4.Visual Inspection & Cup Seal Leak Test
5.Solenoid Valve Assembly Press-Fitting
6.PFS & Master Cylinder Cup Leakage Test
7.PFS & Lips Component Assembly & Riveting
8.Master Cylinder Piston Assembly & Performance Test
9.Solenoid Valve & Assembly Comprehensive Performance Test
10.HCU Assembly High-Pressure Comprehensive Performance Test
11.EOL Performance Test
12.Assembly Packaging