Cycle time: ≤35s (400 thousand production capacity)
Operator allocation: ≤4
Floor area: 2400*1000 cm
Main process introduction:
Coil insertion
PCBA programming and board-level FCT testing
Selective wave soldering
3D AOI inspection and installation of sealing rings
Plasma cleaning and adhesive coating
ECU high-temperature FCT
ECU air tightness test
Integrated HCU and ECU
High-voltage testing and EOL testing
Laser marking
Support gasket assembly